Projects: phases, milestones and what they cost

A renovation, a build, anything with a start, an end and money spent along the way: lay it out in phases, milestones and work packages, route its costs to it, and read what it has cost.

All how-tos

  1. 1

    Add the project

    Under Projects, Add a project asks for a name, the currency it reports in, and optionally the property it is for, its planned start and end, and a description. A project belongs to the book you add it in; added, it is chosen in the list and its details open beside it, on Cost first. Above the details, Cost, Procurement and Milestones choose what you see.

  2. 2

    Lay out its phases

    Choose Milestones above the project's details: there, under Phases, Add a phase names each stage of the work — demolition, rough-in, finishes — in the order they come. A phase is a heading for the work, not money; a milestone can name the phase it closes.

  3. 3

    Mark its milestones

    In the same Milestones view, Add a milestone names a date the work answers to — the frame up, the handover — with the phase it closes and its target date. A milestone is a date, never an amount; the figures above count the phases done and say when the next milestone is due.

  4. 4

    Break it into work packages

    Back on Cost, Add a work package gives each piece of work a code and a name, and a parent work package where one belongs inside another, so a kitchen can sit under the ground floor. Once money names a work package, its row draws its budget, what is committed and what was spent.

  5. 5

    Estimate it, then approve a budget

    Further down Cost, under Estimates, Add an estimate names one, and Add a line prices each piece of work — an amount, or a quantity times a unit price, which the app works out to the cent. Make current makes it the project's estimate; a later one replaces it, and the one it replaces is kept as superseded. Under Budgets, Add a budget can start from the current estimate's lines, and Approve makes it current with the date it was approved. A current or superseded plan is kept as it was: to change it, add a new one.

  6. 6

    Award the work, with its retainage

    Choose Procurement: Add a procurement names what is being bought, and Add a bid records each offer for it — a supplier you have not met can be named on the spot — with what it prices and its tax; the app adds up its subtotal and total. Accept the one you choose and Reject the others. Award commits the money: what is committed, any advance, and the retainage — a percentage withheld, whose amount the app works out — until the milestone you name.

  7. 7

    Route its costs to it

    A cost reaches a project from where it was paid: while reviewing a statement, once a row has its category, Property or project in its Details routes it to the project — or to the property it is for — and a category that asks which expense account it posts to asks for it there. Recording an entry by hand routes it the same way, with Property or project beside its category — on an account in another currency too — and a posted entry's Change category, or its split, routes it afterwards. The money stays in its category and its account; the project is carried beside them.

  8. 8

    Read what it has cost

    Cost's Financial totals keep the money apart, each in its own currency, never blended: Budget is the approved budget, with the current estimate under it; Committed is what awards have committed, with what of the budget is not yet committed; Actual is what was routed to the project and posted — a row routed in a statement's review counts once the statement is posted; and Remaining is what is left of the budget, in red once spending passes it. Procurement adds the Retainage held back until each award's milestone, which is expected rather than a shortfall.

  9. 9

    Start from a template

    A template comes with a country pack. Bulgarian construction's, with Acts 14, 15 and 16 of Ordinance No. 3 named in the regulation's own words, is in Bulgarian construction templates: under Settings → Country packs, Install pack version installs it. Add a project then asks what to Start from: choose the template, and the project starts with its phases, its milestones — each statutory one marked with its code and the provision it comes from, lined up in order under Milestones — and its work packages, all yours to edit.

  10. 10

    Start, complete or cancel it

    A project begins as a draft. Beside its status, its menu moves it on: a draft can Start the project or Cancel the project; an active one can Mark completed or Cancel the project; a completed one can Reopen the project. Each asks first and says what follows — starting dates its start today, and completing its end, when none was recorded, and reopening clears the end. A project's figures and records stay whatever its status.